Geotechnical instruments container loading is a very difficult problem for the dispatch department. International Freight refers to transport from one country to another in one or more modes of transportation, mainly by sea, land, railway, air transportation. Container shipping is often involved in marine and railway transportation.
The process of loading goods in containers, such as van, sea container, air container, carton or pallet.
Bin packing problem can be divided into one-dimensional bin packing problem, two-dimensional bin packing problem, and three-dimensional bin packing problem.
One dimensional packing problem considers only one factor, such as weight, volume, length, etc..
The two-dimensional bin packing problem takes into account two factors, which generally refer to length and width
Three-dimensional bin packing problems take into account three factors: general length, width, and height. Loading, loading, loading containers and so on should be taken into account, these three dimensions can not exceed.
Complete Geotechnical Instruments Container Loading Process
How to Packing
LUDA strictly implement the export packaging requirements, in the process of each instrument packaging, the instrument will be special reinforcement, protect the goods in the transportation process without breakage.
Compression testing machine and universal testing machine must be packed carefully because it may be broked in complex sea shipment.
Bin packing simulation
According to the number of goods, the size of the outer box, the weight, the size of the container, the number of stacking layers, the simulation package is carried out on the software.
The problems In packing Geotechnical Instruments:
- the direction of the goods set, that is, the goods in the container in which way to put loading.
- the maximum stacking layers, the same type of goods to the maximum number of vertical stacking.
- bearing capacity, the bearing capacity of different goods will determine the superposition of different goods.
- Whether it can bear other kinds of goods, the rules are used in the goods as fragile goods or other goods which are not suitable to bear other types of goods.
- the suspended ratio, the maximum ratio of the upper goods cannot be supported.
- maximum container weight.
- priority, that is, the loading order of goods, suitable for multi-station loading.
- Simulate the gap, and simulate the space occupied by the filler when the material needs to be filled.
- Reserve space to ensure air circulation or make a part of the container not loaded with goods.
- The same goods are placed adjacent to each other.
- Display the center of the container and the center of gravity of the loaded goods.
Starting Geotechnical Instruments Container Loading
The sky under a light rain, the container car factory on time.
According to the simulation results, start the actual loading
Finish packing task perfectly.
Close container door, add the lead lock.
The seal is a lock of the container, but can only be used once, after opening on the bad, cannot be reused. There is a title, is the one and only, if customers get the seal number with the bill of lading, on behalf of the container is not opened, the goods in good condition.
LUDA has been trying to make everyone receive good laboratory equipment.
Post by Luda Machinery Instrument(http://www.ludatest.com).
Discuss more details with our sales engineer today!
LUDA will be love to work with you and meet your testing requirements.
Most Popular Machines
-
Compression testing machine:
Compressive test, flexural test, bending test for concrete, cement, brick, etc.
-
Universal testing machine:
Universal test, tensile test, bending test, flexural test, compressive test for steel bar, steel rod, etc.